Kings Cross
Worth over £700,000
With a total 100 tonne
December 2017 - January 2019
Crash deck installed to the delivery ramp servicing Kings Cross St Pancras station. This was installed to allow the demolition of the existing slab over the delivery ramp whilst keeping the busy service area accessible at all times. Existing circular concrete columns strengthened with a fabricated full height cylindrical steel plated sleeve. New plate girders from fourteen to twenty ton installed to ground level. All works carried out to the existing structure to enable the construction of the new Google head office at Kings Cross.