Manor Point
Worth over £370,000
With a total 21 tonne of steelwork and 1700 metres of purlins
February 2021 - June 2021
Installation of new mezzanine steelwork to existing warehouse. Steelwork installed to create two new floor levels increasing the storage space by more double its original capacity. Two new four flight staircases at each end with a double flight from first to second floor installed for welfare access.